Group Members
Milestone Current Location: Home > About Us > Milestone
  • Oct. 2004
  • 2005
  • 2006
  • 2007
  • 2008
  • 2008
  • 2009
  • 2010
  • 2011
  • 2013
  • 2014
  • Steuler-Bobby (Shanghai) Engineering Equipment Co., Ltd. was established
    Steuler-Bobby (Shanghai) Engineering Equipment Co., Ltd. was established
  • Project of stainless steel pickling line at  Plant No.5, Baosteel / Project of desulfurization waste water treatment at power plant, Baosteel
    Project of stainless steel pickling line at Plant No.5, Baosteel / Project of desulfurization waste water treatment at power plant, Baosteel
  • Ammonia flue gas desulfurization at fertilizer plant, Petrochemical, Urumqi / Mixed acid regeneration line at Stainless Steel Plant No.1, Baosteel / Pickling line at Baosteel Special Steel
    Ammonia flue gas desulfurization at fertilizer plant, Petrochemical, Urumqi / Mixed acid regeneration line at Stainless Steel Plant No.1, Baosteel / Pickling line at Baosteel Special Steel
  • Pickling line at Vossloh Fastening Systems (China) Co., Ltd / Glass etching line, phase 1 at Hengtong Optic-Electric, Jiangsu
    Pickling line at Vossloh Fastening Systems (China) Co., Ltd / Glass etching line, phase 1 at Hengtong Optic-Electric, Jiangsu
  • U-type tunnel pickling line at Nanjing Baori Wire, Baosteel
    U-type tunnel pickling line at Nanjing Baori Wire, Baosteel
  • Applied and passed the quality management certification by TÜV Rheinland (China) Co., Ltd. and joined the quality management system ISO9001
    Applied and passed the quality management certification by TÜV Rheinland (China) Co., Ltd. and joined the quality management system ISO9001
  • Tunnel pickling line at Xianyang BOMCO Steel Tube & Wire Rope Co.,Ltd
    Tunnel pickling line at Xianyang BOMCO Steel Tube & Wire Rope Co.,Ltd
  • Glass etching line, phase 2 at Hengtong Optic-Electric, Jiangsu
    Glass etching line, phase 2 at Hengtong Optic-Electric, Jiangsu
  • Glass etching line, phase 3 at Hengtong Optic-Electric, Jiangsu
    Glass etching line, phase 3 at Hengtong Optic-Electric, Jiangsu
  • Glass etching line, phase 4 at Hengtong Optic-Electric, Jiangsu
    Glass etching line, phase 4 at Hengtong Optic-Electric, Jiangsu
  • Supply of the complete set of glass etching line to STERLITE, Indian and on-site service of assembly guidance
    Supply of the complete set of glass etching line to STERLITE, Indian and on-site service of assembly guidance
Copyright © 2016 Shanghai History channel than LeBow Engineering Co., Ltd 沪ICP备16020502号 Site Map | Legal Notices